GCSA Studios

Don't be surprised if there's team-killing.

General Cast On November - 10 - 2008

[Oracle] began construction this afternoon. The first and second stage engine mounts are completely assembled. Hopefully by tomorrow morning the lower stage fuselage and fin structure will be completed. [Oracle] itself should be ready for launch by 16 November 2008, but the electronics and optics are proving problematic.

Possible Solutions (in order of ease)

  • Switch to custom NiCd batteries, or multiple Zn/MnO2 batteries in parallel
  • Extend antennae wires by several inches
  • Replace entire optics package

Keep the Faith,
JPL Team

Category: News

Comments are closed.

Featured Video
View on YouTube
Quick Links